A universal controller for photovoltaic installations that performs monitoring and control functions according to grid connection requirements. It works with no power limits and no cap on inverter count.

Yes — the PV Supernode controller holds a full EU declaration of conformity.

Two key ones: Sitelogger — monitoring and control of inverters from the DSO via telemechanics, and Limited/Zero-Export — real control of energy export to the grid.

The PV Supernode controller has no such limits and supports multi-level master-slave structures.

Sofar, Solis, Goodwe, Growatt, Solaredge, Sungrow, Huawei, Kostal, Solplanet, Kehua, Fronius and others.

Yes — a single installation can mix devices from different manufacturers.

Eastron, Socomec, Lumel, F&F, Schneider, Lovato, Janitza and others.

Mikronika MSG701 and USP140, Apator Ex-BRG3 and SPV-RM, Regulus uREG, IEN Gdańsk STGP.

Yes — PV Supernode talks to the telemechanics controller via the RS485 interface and Modbus RTU protocol.

Modbus RTU and TCP, MQTT secured with TLS, OpenVPN.

Yes — via Modbus RTU or RS485. We recommend the Elsner P03/3 Modbus RTU weather station.

3 × USB 2.0 and 2 × RS485 ports, which can be extended to 5 via USB adapters.

A telemechanics controller is required to communicate with the Distribution System Operator.

An energy analyzer installed at the grid connection point is required.

Yes — a unique feature of PV Supernode is the ability to run Sitelogger and limited/zero-export simultaneously.

Contact the sales department: +48 737 884 377 or info@advant.pl.

The price depends on farm size, selected features and inverter manufacturer. Send a request to info@advant.pl — we will prepare a tailored quote.

A pre-configured device ships within 7 business days of proforma invoice payment.

Review the documentation received by email: quick start, checklist and register map.

An internet connection and up-to-date inverter firmware.

Send an email to support@advant.pl describing the problem. If needed, the controller can be sent in for diagnostics.